Repacking & Moving Your Thunder

Repacking & Moving Your Thunder

Gantry Series

Much of this can be gleaned from the unpacking process, but we have some best practices for repacking and/or moving the machine. 
Info
If you need to disassemble the machine, please also reference this article:

Head and Gantry

The Nova head and gantry is not typically secured. The motors and motion control systems in the nova series machines will move but they wont slide back and forth uncontrollably so there is not much chance of the head crashing during normal moving and even when dismantled and flipped, etc...



For your Bolt/Odin machines, you should zip tie the head to the back left corner like how it was delivered.


Bed and Blades

You need to ziptie the honeycomb to the frame that holds the blades to secure the bed and sandwich the blades to help hold them in place

Alert
It is important to check the blades before powering up the unit.



Idea
Optionally, you could remove and transport the honeycomb and blades separately. 

Chiller and Laser Tube


Warning
You do not need to remove the tube. It travels just fine in thunder's rigid and strong frame
Info
If you have and RF tube without a chiller or water, you can skip this section

You will need to drain the coolant from the system, then disconnect the 2 water lines and wire between the chiller and laser. use one tube to loop the laser water ports, and the other on the chiller inlet and outlet ports. this will prevent any residual water spilling out and close off the ports so they don't become contaminated. An example of looping the chiller can be seen below




The machine may come packed with foam around the tube. If you can cushion the tube with foam, blanket, etc. Double check that the grub screws on the tube mounts are tight, they are what hold the tube in place. Inspect the tube mounting straps, look for tears or cracks.